Projects
Below are a few projects from our resume:
PROPIETARY DESTRUCTION
A1 was contracted by a large manufacturer in Winston Salem to destroy and dispose of $100,000,000.00 of product. A1 transported the 645 tractor trailers from their facility to our Overdale Rd. Transfer Station and processed the material. Then the material was loaded into our walking floor trailers and transferred to be landfilled. This project duration was 3.5 months and was completed in 2022.
GREENFIELD QUARRY - MARINE LIMESTONE CRUSHING/ SCREENING
A1 was contracted by Summit Materials to mobilize a fleet of crushing and screening equipment into a greenfield quarry in North Charleston, SC. We mobilized a scalping screener, cone crusher, jaw crusher, a horizontal wash plant and 6 stacking conveyors. We were able to achieve a DOT spec 57 product and provide them with over 475,000 tons of saleable products. The project duration was 2 years and was completed in 2024.
CRUSHING BLASTED ROCK FOR NEW LANDFILL CELL
A1 mobilized a Powerscreen 600 jaw crusher into a landfill in Raleigh, NC. We hammered, processed and stacked 117,000 tons of rock. The duration was 3 months and was completed in 2019.
TALL OAKS APARTMENTS DEMOLISHED
A1 was contracted by Blueridge Contractors to demolish and landfill 10 apartment buildings. We mobilized our equipment in, utilized our walking floor trailers and landfilled the material at our Bishop Rd. Landfill. The project duration was 6 weeks and was completed in 2014.
PROVIDED RECYCLED ABC MATERIAL TO PLANT FIRE
A fertilizer plant caught on fire in Forsyth County about 5 miles from our Overdale Rd. Transfer Station. We provided the cleanup with 3700 tons of our recycled ABC material in a 36-hour time frame. The project duration was 36 hours and was completed in 2021.